15/10/2026
In every transaction, one of the things insisted upon before any contract is signed is a professional engineer report.
In one recent transaction, the report flagged a minor leak in the basement of the property being purchased. It was not catastrophic, but it needed to be addressed. As part of the purchase agreement, the seller committed in writing to repairing the leak before handover. The transaction moved forward with that condition on record.
Then, in the days before the handover date, and despite having repaired it weeks before, the minor leak became a major one.
What had been a manageable repair had quietly escalated into a significant water problem.
The engineer report did not prevent the problem. But it documented the property's condition before it became the buyer's. It gave the written seller commitment its legal grounding. And when the situation escalated, it was what made it possible to hold the other side to their word.
Do not skip the engineer report.