28/05/2025
Hi Everyone,
We are currently looking to fill a Manila – Home Based – Senior Façade Drafting position.
We are seeking candidates who is willing to work from home, who will be working online with some of the teams from Perth Australia Candidates who meet the key requirements , must possess the necessary knowledge for position and familiar with the software as detailed in the job descriptions. .
If you are nterested in this opportunity, please email your cover letter and updated resume to Jacqueline at [email protected]
We look forward to receiving your application.
Senior Façade Drafting position.
Job scope per below:
• Ensure that you review a project upon handover.
• Review and Produce Shop Drawings, concept to IFA (issued for approval) to IFC (issued for construction) to As Builts.
• Review and Produce Set-Outs or Fabrication sheets.
• Scheduling, BOM, material optimization, Stock Control, etc
• Façade Design meetings (requires coordination with Clients, Builders, Factory Manager, Foreman, Engineering, MD).
• Liaise with external supplier/s on design and interaction/installation to openings.
• Liaise with PM/Site on installation including problems and solutions.
• Procurement management - Material take off (Aluminium, Glass, Consumables)
• Identify and inform Variations to Estimator.
• Coordinate Scheduling and program requirements.
• Document Control – manage and update daily.
• Extrusion system stock control.
• Using PRS to manage and co-ordinate TASKS, Procurement, Setouts, Daily Reports.
• Continuous learning required on extrusions systems and new developments in Australian Standards.
Project Documentation Review RequirementsWhen a new project is won a project handover will be done by the estimating department to inform stakeholders of the basic project requirements.A review of the following documentation needs to be completed by Team Leaders in the Planning department:
1. Planning staff to review and comprehend the new job requirements and can discuss/debaterequirements with internal and external stakeholders.
2. To identify job requirements for the Project and allow a more comprehensive understanding of the job as a whole.
3.To identify and raise any areas that may have been missed, including variations.
4.To understand the higher risk parts of the job and to enable meaningful discussions on risk management.
5.To understand the fine detail as well as the broader scope and the Architectural intent of the job.
Documents that need to be reviewed by Planning and Project Staff:
1. Project Summary and handover as prepared by Estimating Department.
2. Architectural drawings; floor plans, window and door schedules and details.
3. Architectural specifications.
4.Wind Loading requirements.
5.Facade specification.
6. Glass Schedules and Types.
7. Extrusion/Framing Systems and Schedules.
8. Acoustic reports
9. Finishes schedules.
10. Sample submission documents.
11. Within the documents find and understand the following: Glass types, Extrusion types, Finish types and Auto door requirements.
12. Section J reports and any thermal studies and how they relate to whole of window thermal analysis13. Wind reports and structural steel and engineering reports.
Document Checking Requirements – Note all documents need to go through a checking process.
All internally generated drafting drawings checked at Internal, IFA and IFC stages.
Check extrusion type.
Check Glass Type.
Check Finish Colour and Type.
RL and size checks.
Glass type checks.
Fixings check.
Material checks and optimisations.
Key Strengths Required
• Ability to run Façade design meetings from sketch concepts to final shop drawings.
• Self motivated.
• Excellent English communication skills, both verbal and written.
• Ability to handle pressure.
• Ability to manage people.
• Ability to organise and manage multiple jobs.
• Ability to identify and build relationships with Builders.
Software Experience Required
• Experienced AutoCAD user.
• Experienced Logikal user.
• Microsoft Excel, TEAMS, emai